Overview production/consumption:  8 day  6 week  12 month  3 year      Overview transmission:  8 day  6 week  12 month      Utilities:  Search   Advanced search   Enable Alerts


Planned diverging trading capacity for Nordic Electricity Exchange Area interconnections during the next 12 months

Areas
Line
Normal
Trading
capacity MW
Updated: 2010-03-11 10:13:18 

= Line out or reduced in month no.
Available
Trading
capacity MW
 Remarks
From To Export Import
4 5 6 7 8 9 10 11 12 1 2 3
Export Import
                 
DK2 DE Kontek 550  550   30.10 - 22.11: KONTEK will be o ...
DK1 DK2 Storebælt 600  600   20.08 - 20.08: The Greatbelt co ...
DK1 DE Border between Denmark and Germany 1500  950  1100  950   01.03 - 09.04: Due to work on t ...
DK1 NO2 Skagerrak 950  1000  750  750   12.04 - 15.04: Yearly maintenance.
DK1 NO2 Skagerrak 950  1000  500  680   12.04 - 15.04: Work in Kristian ...
EST FI Estlink 350  350  350   01.01 - 31.12: Estlink limitati ...
EST FI Estlink 350  350   09.06 - 10.06: Yearly maintenance.
FI RU Finland-Russia 1300  1100   04.04 - 24.04: NWPP (Northwest ...
FI RU Finland-Russia 1300  400   03.07 - 26.07: Vyborg DC-statio ...
FI SE Finland-Sweden 1650  2050  1100  1500   04.10 - 04.10: Measurements bef ...
FI SE Finland-Sweden 1650  2050  1100  1500   05.10 - 09.10: The yearly maint ...
NO2 NO1 NO1-NO2 3000  2000  1700  1300   11.01 - --.--: As described in ...
NO3 NO4 NO3-NO4 600  600   11.01 - --.--: Norway split int ...
NO3 NO4 NO3-NO4 700  700   20.01 - --.--: To conform with ...
NO3 NO3 Central Norway  25.01 - --.--: Due to low inflo ...
NO4 SE Rana-Svartisen 800  600  500  350   18.10 - 27.10: New stop time. ...
NO3 SE Rana-Svartisen 600  600  500  500   18.10 - 27.10: New stop time. ...
NO4 SE NO4-SE 800  600  800  600   11.01 - --.--: Norway split int ...
NO3 SE NO3-SE 600  600  600  600   11.01 - --.--: Norway split int ...
NO1 NO1 ELSPOT  11.01 - --.--: From 11.01.10, N ...
NO1 SE NO1-SE 2050  2000  2000   11.01 - --.--: During high-load ...
NO4 SE NO4-SE 800  600  600  600   20.01 - --.--: To conform with ...
NO1 NO2 ELSPOT  15.03 - --.--: Due to possible ...
NO2 NO1 ELSPOT 2600  1600  2600  1600   15.03 - --.--: from 15.03.2010: ...
NO5 NO2 ELSPOT 700  550  700  550   15.03 - --.--: From 15.03.2010: ...
NO1 NO5 ELSPOT 650  700  650  700   15.03 - --.--: Capacities refer ...
NO1 NO5 ELSPOT  15.03 - --.--: Installed produc ...
NO4 SE Salten-Svartisen 800  600  500  350   28.06 - 10.07: Maintenance
NO3 SE Salten-Svartisen 600  600  500  500   28.06 - 10.07: Maintenance
NO3 SE Nea-Jãrpstrõmmen 600  600   23.08 - 03.09: Updated line. R ...
SE PL Horred-Söderåsen 600  600  400   16.08 - 27.08: Outage due to th ...
SE DE Horred-Söderåsen 600  600  200   16.08 - 27.08: Outage due to th ...
SE DK2 Horred-Söderåsen 1300  1700  300   16.08 - 27.08: Outage due to th ...
SE FI Messaure - Svartbyn 2050  1650  1200  1050   06.04 - 09.04: Maintenance
SE FI Letsi-Petäjäskoski 2050  1650  1150  850   17.04 - 18.04: 400 kV line Petä ...
SE FI Sweden-Finland 2000  1600  600   09.10 - 10.10: Black start test ...
SE SE Borgvik-Skogssäter  24.05 - 18.06: Required mainten ...
NO4 SE Nea-Järpströmmen 800  600  500  450   23.08 - 03.09: Remaining works ...
SE PL SwePol Link 600  600   13.09 - 17.09: Yearly maintenance.
SE SE Message from Svenska Kraftnät  29.11(2005) - --.--: During the high ...
SE SE System protection  25.03(2006) - --.--: A system protect ...
SE SE West Coast corridor  28.03(2006) - --.--: Due to high tran ...
SE NO1, DK1, DK2, SE, PL, DE West Coast corridor  19.04(2007) - 31.08: The maximum capa ...
SE SE GAS turbines  21.02 - --.--: E.ONs gas turbin ...
SE SE Finnböle  15.03 - 29.04: Still not normal ...
SE FI Harsprånget-Letsi 2050  2050  650  1250   16.04 - 17.04: Affected areas c ...
SE SE Alvesta-Simpevarp  24.05 - 02.06: Outage of the 40 ...