Failures and planned diverging trading capacity for Nordic Electricity Exchange Area interconnections during the next 8 days

Areas
Line
Normal
Trading
capacity MW
Updated: 2009-07-03 15:26:43 

= Line out or reduced at date.
Available
Trading
capacity MW
 Remarks
From To Export Import 03.07 04.07 05.07 06.07 07.07 08.07 09.07 10.07 Export Import
                               
DK1 DK1 Sealed in production 209  209   25.06 - 17.07: Due to failure o ...
DK2 DE Kontek 550  550  300  550   29.06 - 23.07: Due to maintenan ...
DK2 DE Kontek 300  550   06.07 - 06.07: Due to work on t ...
DK1 DK1 DK1  04.03 - 04.03(2013): As at March 4, 2 ...
DK1 DE Border between Denmark and Germany 1500  950  200  200   29.06 - 10.07: Due to change of ...
DK1 NO1 Skagerrak 1000  950  1000  800   24.06 - 01.09: Due to high temp ...
NO1 DK1 Skagerrak 1000  1000  680  500   02.07 - 03.07: Outage of one bu ...
DK1 OTH Cut B (DK1) 1740  1630  500   29.06 - 10.07: Due to change of ...
DK1 SE Konti-Skan 740  680  740  680   12.11(2007) - --.--: The tradingcapac ...
EST FI Estlink 350  350  209   09.04 - 18.10: Estlink limitati ...
NO1 NL NorNed 700  700  600  700   24.06 - 01.09: Due to high temp ...
NO3 NO2 NO2-NO3 600  600   13.04 - --.--: Norway split int ...
NO3 NO2 Ogndal-Verdal 600  400   07.07 - 08.07:
NO3 SE Ogndal-Verdal 800  600  500  450   07.07 - 08.07: Correction in av ...
NO1 DK1 Tonstad busbar 1000  1000  500  500   07.07 - 09.07: Due to required ...
NO1 NL Tonstad busbar 700  700  400  700   07.07 - 09.07: Due to work in t ...
NO1 SE Rød-Hasle 2050  2000  300  1100   14.04 - --.--: This UMM concern ...
NO1 SE Halden-Skogsäter 2050  2000  150  600   03.07 - 03.07: Back in operation.
SE DE Baltic Cable 600  600  600  600   13.10(2008) - --.--: Market coupling ...
NO3 SE SE-NO3 800  600  800  600   13.04 - --.--: Norway split int ...
NO2 SE SE-NO2 500  500  500  500   13.04 - --.--: Norway split int ...
SE NO1 Borgvik-Kilanda 2000  2050  2000  650   15.06 - 03.07: Maintenance
SE DK1 Borgvik-Kilanda 680  740  300  740   15.06 - 03.07: Maintenance
NO2 SE Nea-Järpströmmen 500  500   22.06 - 31.03(2010): Construction of ...
NO3 SE Nea-Järpströmmen 800  600  600  450   22.06 - 31.03(2010): Construction of ...
SE PL SwePol Link 600  600  400   01.07 - 31.07: Svenska Kraftnät ...
SE SE Message from Svenska Kraftnät  29.11(2005) - --.--: During the high ...
SE SE System protection  25.03(2006) - --.--: A system protect ...
SE SE West Coast corridor  28.03(2006) - --.--: Due to high tran ...
SE NO1, DK1, DK2, SE, PL, DE West Coast corridor  19.04(2007) - 31.08(2010): The maximum capa ...
SE NO1 Skogssäter-Kilanda och Skogssäter-Halden 2000  2050  650  650   06.07 - 10.07: Maintenance
SE DK1 Skogssäter-Kilanda och Skogssäter-Halden 680  740  300  740   06.07 - 10.07: Maintenance